Nine projects. One standard.
Start-ups in emerging markets, turnarounds, relocations and lean programmes: every case study shows the starting point, methods, stakeholders and result. Out of discretion we do not name clients – only industry, region and figures.

Start-up & plant construction
Start-up in an emerging market
Automotive supplier, Mexico
On time and on quality to ramp-up: building a supplier plant in Mexico despite infrastructure, raw material and supplier problems.
- Result
- SOP on time; scrap ≤2.5 %; AUDI/BMW audits passed; second shift; KPI-led departments; from Excel-based control to ERP, partially digitalised
- Duration
- 18 months

Lean & cost
Quality and delivery dates under control
Medical device manufacturer, Switzerland
- Result
- Scrap ≤ 1 %, 95 % on-time delivery, 7 % cost reduction, quality issues resolved by changing raw materials, ISO 13485 certification prepared
- Duration
- 12 months

Start-up & plant construction
From brownfield to series in 18 months
Textile producer, Eastern Europe
- Result
- USD 100m brownfield; 6-month skilled-worker training for 250 FTEs; USD 40m machinery; SOP 18 months; defects <2.5 %; training/local handover 24 months
- Duration
- 2 years

Turnaround
From bankruptcy back to the world's top
Machinery manufacturer, Europe
- Result
- Year 1: 6 % EBIT; year 2: 8.5 %; global top 3 again; patent purchase: basis for +100 % revenue from 2015; PE exit: MOIC 3.1, IRR 25 %
- Duration
- 24 months

Interim management
A textile giant struggles with details
Textile group, Mexico
- Result
- Prod. costs −5 %; 2 new products; in-house chemicals 250→470 t/month (savings ~USD 500k p.a.); GreenDenim developed; Colombia plant optimised
- Duration
- 12 months

Lean & cost
Premium equipment globally competitive
Plant engineering company, Germany
- Result
- Cost reduction potential of 15 (±2) %
- Duration
- 6 months

Interim management
From patriarchal leadership to a modern structure
Safety equipment manufacturer, Germany
- Result
- Set-up & local handover: 24 months; QMS/ISO, KPIs, staff turnover <2 % p.a., double-digit EBIT in contract manufacturing, partial digitalisation
- Duration
- Interim mandate

Production relocation
Production relocation without supply interruption
Large-format digital printing company, Germany
- Result
- Major US contract; plant 2 ramped up with partial digitalisation; scrap 10 → <1.5 %; 5S/CI; high single-digit EBIT; local handover in 24 months
- Duration
- 24 months
All projects are presented anonymously.