Skip to content
All case studies

Lean & cost, Mechanical and plant engineering, Germany

Premium equipment globally competitive

A German product is preferred on the world market despite a 15 to 20 % higher price level – if product, service and sales are right. The rest is lean manufacturing and the right make-or-buy decision.

Client
Plant engineering company
Industry
Mechanical and plant engineering
Location
Germany
Duration
6 months
Services
Interim management

Project brief

Starting point
Excessive production costs
Methods
Value stream analysis, (partial) outsourcing
Stakeholders
Owner, management and departments
Result
Cost reduction potential of 15 (±2) %

Measurable. Traceable.

15%
cost reduction potential (±2 %)
6months
from analysis to action plan

Make or buy assessed simultaneously. Lean measures and outsourcing alternatives evaluated in parallel – because mid-sized companies don't have 12 to 18 months.

From the starting point to the result.

Challenge

Higher labour costs than in Portugal or China, competitors with cheaper product variants and customers who mostly buy on price. Time was pressing.

  • Labour cost disadvantage in Germany
  • Price pressure from technically simpler foreign variants
  • No time window for long programmes

Approach

Value stream analyses and rigorous lean implementation reduced variable production costs – and with them overhead surcharges. Partial outsourcing alternatives were assessed simultaneously, because lean promises more on paper than practice often delivers.

  • Value stream analysis of all core processes
  • Lean action plan with cost impact
  • Parallel make-or-buy assessment

Result

A cost reduction potential of 15 (±2) % in six months – enough for increased competitiveness. Higher production volume brings further savings.

  • 15 % cost potential identified
  • Action plan in 6 months
  • Basis for volume growth

The path to the result.

6 months

  1. Month 0–1

    As-is assessment

    Cost structure and value streams recorded.

  2. Month 1–3

    Value stream analysis

    Waste and potential quantified.

  3. Month 3–5

    Make or buy

    Partial outsourcing alternatives assessed.

  4. Month 5–6

    Action plan

    Implementation roadmap with 15 % potential handed over.

What WOLF was responsible for in this project.

Interim management

Plant and general management on a temporary basis – until handover to the local leadership team.

Learn more

A similar starting point?

Let's talk about your plans – no obligation, at eye level.