Interim management, Textile industry, Mexico

A textile giant struggles with details

Giving a corporation more agility is no walk in the park. When environmental activists are at the door, wastewater values are off and a 20 million order is at risk due to a supplier failure, troubleshooting needs diplomacy – and speed.

Client
Textile group
Industry
Textile industry
Location
Mexico
Duration
12 months
Services
Interim management, Ramp-up management

Project brief

Starting point
Excessive production costs, missing new products, insufficient environmental protection, occupational safety issues
Methods
Value stream analyses, KAIZEN, project and change management
Stakeholders
Owner, management and workforce
Result
Production costs reduced by 5 %, 2 new developments

Measurable. Traceable.

5%
reduction in production costs
2new developments
to market readiness in twelve months
20M USD
order secured through supplier solution

Technical Director ad interim. Several technical departments were structurally and lean reorganised – the company still benefits today.

From the starting point to the result.

Challenge

Environmental requirements from global brands, a threatened order loss of 20 M USD due to a supplier failure, excessive production costs and no staff reserve for special tasks. Outsourcing was ruled out to protect trade secrets.

  • Wastewater values and customers' sustainability promises
  • Supplier failure for a key product
  • Internal political resistance in the corporation

Approach

WOLF took over as Technical Director ad interim: fast problem solving, getting parties on board, dismantling resistance diplomatically – with escalation where necessary. Value stream analyses, KAIZEN and project and change management brought SME flexibility into the corporation.

  • Troubleshooting with a clear escalation strategy
  • Value stream analyses and KAIZEN in production
  • Lean reorganisation of the technical departments

Result

Production costs cut by 5 %, two new developments brought to market readiness, environmental and occupational safety on track. The company still benefits from the reorganisation today.

  • 5 % lower production costs
  • 2 new developments
  • Sustainable structures in the technical departments

The path to the result.

12 months

  1. Month 0–1

    Troubleshooting

    Environmental and supplier crisis stabilised.

  2. Month 1–4

    Analysis

    Value stream analyses and cost structure.

  3. Month 4–10

    Reorganisation

    Technical departments set up lean, new developments started.

  4. Month 10–12

    Handover

    Results secured, responsibility to line management.

“As Technical Director ad interim, various technical departments were led and reorganised structurally and lean. The company still benefits from this today. The modern leadership style was highly valued by the employees.”
Director, Textile group, Mexico

What WOLF was responsible for in this project.

Interim management

Plant and general management on a temporary basis – until handover to the local leadership team.

Learn more

Ramp-up management

KPI-driven ramp-up, quality assurance and stabilisation up to target capacity.

Learn more

A similar starting point?

Let's talk about your plans – no obligation, at eye level.