Skip to content

Services

Interim management.

When a leadership position has to be filled at short notice or change is ahead, we take on responsibility for a limited time – as plant manager, technical director or managing director. Neutral, with no career interests in the company, and with the goal of making ourselves redundant once the result is secured.

When an interim manager helps

  • Plant or general management drops out at short notice or has not yet been filled.
  • A turnaround or realignment needs speed and experience.
  • After an acquisition, a modern leadership structure has to be established.
  • Management needs a sparring partner who takes over projects completely.

What we take on

  • 01

    Interim plant management

    Operational responsibility for production, quality and engineering – until handover to a permanent appointment.

  • 02

    Interim general management

    Leading the company or a foreign subsidiary through critical phases.

  • 03

    Turnaround and realignment

    Reviving companies in financial difficulty and strategically realigning the value chain.

  • 04

    Change management

    Change based on Kotter's proven 8-step method – plannable and with a reliable time frame.

  • 05

    Lean management

    Eliminating waste in production and administration – with CIP, 5S and Lean Six Sigma.

  • 06

    Internal audit and controlling

    Audits as teamwork that look for solutions rather than culprits, and KPI systems that make every day measurable.

How an interim assignment works

  1. 01

    Conversation

    Openly clarify the task, expectations, time frame and budget.

  2. 02

    Memorandum

    Put the goals in writing – and take time to do so.

  3. 03

    Analysis

    Understand root causes before acting.

  4. 04

    Implementation

    Hands-on in line operations, following Plan-Do-Check-Act.

  5. 05

    Handover

    Secure the result and hand back responsibility.

The 8 steps of change

  1. 1Create a sense of urgency
  2. 2Build a guiding coalition
  3. 3Develop a vision for change
  4. 4Communicate the vision
  5. 5Implement change broadly
  6. 6Set short-term goals
  7. 7Absorb setbacks, consolidate gains
  8. 8Anchor changes and test them for stability

Frequently asked questions

What does an interim manager do?

He takes on a leadership role for a limited time with full responsibility – comparable to an air traffic controller who guides the pilot safely to the end of the runway. He works according to Plan-Do-Check-Act, neutral and hands-on, and leaves once the jointly defined goal has been reached and secured.

How long does an interim assignment last?

Until the agreed goal has been reached and secured. In our experience, comprehensive change takes 18 months on average; individual projects and bridging assignments are considerably shorter.

How does an assignment begin?

With an open conversation about the task, expectations, time frame and budget. We then record the goals in a memorandum.

What distinguishes an interim manager from a consultant?

A consultant recommends; an interim manager implements and carries responsibility in line operations. We combine both: analysis and concept with implementation on site.

Let's talk about your project.

A first conversation clarifies the task, expectations, time frame and budget – openly and confidentially.

Arrange a call